The Sludge Loading Project

The project for loading sludge – Shafdan The project, amounting to 27 million NIS, was carried out between 2015 and 2016.

The facility is used to absorb sludge that is digested and squeezed into 4 silos of 700 cubic meters each and loading for evacuation by trucks. Automatically by control and communication systems with 100% redundancy. The execution included piping systems, equipment, metal constructions, ventilation systems, electricity, instrumentation and control.p